电玩城赠送金币50万

欢迎访问电玩城赠送金币50万官方网站,我们是一家体育运动设施施工承包资质企业!

贵州塑胶跑道厂家

电玩城赠送金币50万:新闻分类

电玩城赠送金币50万:联系我们

电玩城赠送金币50万 

手机:13608576666 

手机:13985135888

座机:0851-85982398

网址:www.gzfyty.com 

地址:贵州省贵阳市观山湖区中天会展城101大厦A座37楼1-5号


贵州塑胶跑道:夏季塑胶跑道施工注意事项

您的当前位置: 贵州塑胶跑道 >> 新闻中心 >> 行业新闻

电玩城赠送金币50万:贵州塑胶跑道:夏季塑胶跑道施工注意事项

电玩城赠送金币50万: 发布日期:2018-03-02 作者:贵州塑胶跑道 点击:

贵州塑胶跑道:夏季塑胶跑道施工注意事项

Guizhou plastic runway: precautions for the construction of the plastic runway in summer

贵州塑胶跑道

一、贵州塑胶跑道塑胶跑道多雨夏季如何合理安排施工

One, how to arrange the construction of the plastic runway in Guizhou plastic runway in summer

1、注意天气变化

1. Pay attention to the change of weather

根据天气的情况来制定相关的施工计划工作,同时提前做好相关的排水疏通的工作。一旦得知要下雨,那么就可以通过大型的风扇来加速场地的干燥时间,避免雨水造成损坏。

According to the weather conditions to formulate the relevant construction plan work, at the same time to do well in advance the relevant drainage dredging work. Once it is known that it is going to rain, a large fan can be used to speed up the drying time of the site so as to avoid damage to the rain.

2、做好防雨保护

2, do a good job of protection against rain

提前做好防雨的保护工作,尤其是原材料的防潮工作,避免由于下雨造成材料浪费。

The protection of rain prevention is done in advance, especially the moistureproof of raw materials, so as to avoid the waste of material due to rain.

3、提高施工进度

3, improve the construction progress

可以通过多请施工人员集体施工,提高进度,在你天气晴好的时候,安排集体施工。

Can improve the progress through the collective construction, construction personnel please, when you are in fine weather, arrangements for collective construction.

炎炎夏日,对塑胶跑道和塑胶球场的施工都是一大考验,高温暴晒加速水分蒸发,暴雨潮湿干扰施工开展,不仅影响施工进度,对施工质量也是影响颇大。

Hot summer days, the construction of plastic runway and plastic court is a great test. High temperature and sunshine, accelerated evaporation of water, rainstorm and moisture interfere with the construction. It not only affects the progress of construction, but also has great influence on the quality of construction.

贵州塑胶跑道塑胶跑道

Plastic runway in Guizhou plastic runway

二、夏季塑胶跑道施工注意事项

Two attention to the construction of plastic runway in summer

1、防止水珠滴落贵州塑胶跑道塑胶跑道

1, prevent water drops dropping from plastic runway in Guizhou plastic runway

无论是塑胶跑道好事塑胶球。┕ぶ卸寂滤,在胶浆固化前哪怕一滴汗水滴落在上面都会产生明显的气泡,因此在夏季场地施工时避免中午、下午等时段施工,准备擦汗的毛巾防止汗珠滴落在场地上。另外,要注意天气变化夏季是个高温多雨的季节。

Whether it is good plastic plastic runway stadium, in the construction are afraid of the water in the mortar before curing even a drop of sweat dripping will cause obvious bubble in the above, so avoid the noon, afternoon in the summer period of construction site construction, to wipe the towel to prevent sweat dripping on the ground. In addition, it is important to pay attention to the weather change in summer is a hot and rainy season.

2、减少高温影响

2, reducing the influence of high temperature

摊铺、振捣、收水抹面与养护各道工序应衔接紧凑,尽可能缩短施工时间。 同时,在已摊铺好的路面上,应尽量搭设凉棚,避免表面烈日暴晒。

Paving and vibrating, water collection and maintenance of the finishing process should compact, as far as possible to shorten the construction time. At the same time, has good road paving, should try to set up the arbor to avoid surface exposure.

3、拒绝潮湿环境

3. Refusing the wet environment

避免在湿度过大的条件下施工,且施工时必须天气晴朗。温度低于10℃,或高于35℃时,不适合施工;大气相对湿度大于85%,最好也不要开展施工。

Avoid construction under the condition of excessive humidity, and the weather must be sunny. It is not suitable for construction when the temperature is below 10, or higher than 35. The relative humidity of the atmosphere is more than 85%, and it is better to not carry out the construction.

4、谨防脱壳现象

4, beware of the phenomenon of shelling

夏季施工要防止胶面铺筑后发生局部起泡脱壳情况,严格控制基层密实度,防止水泥基础嵌挤不实而脱壳脱层,致使胶面被拉断。基层密实度不够的地方可采用钻头打孔以及灌胶的方式对其加固。

In summer construction, we should prevent local foaming and shelling after laying the rubber surface. We must strictly control the density of the base and prevent the cement foundation from being shuddled, so as to prevent the glue surface from being broken. Where the base density is not enough, it can be reinforced by drilling holes and filling the glue.

5、避免高温作业

5. Avoid high temperature operation

贵州塑胶跑道塑胶跑道在温度过高条件下应停止施工,避免在一天中温度较高的时间进行施工,并且要及时补充人体所需水分,防止中暑的情况发生。

The runway of Guizhou plastic runway should be stopped under the condition of high temperature, so as to avoid construction at high temperature in a day, and replenish human body's moisture in time to prevent heatstroke.


电玩城赠送金币50万:本文网址:/news/503.html

电玩城赠送金币50万:相关标签:贵州塑胶跑道

最近浏览:

欢迎给我们留言
请在此输入留言内容,我们会尽快与您联系。
姓名
联系人
电话
座机/手机号码
邮箱
邮箱
地址
地址
电玩城赠送金币50万-q8电玩城赠送50万金币